China, the United States, Taiwan or Mexico: choosing where to make a first run

For a first batch the cheapest unit price usually loses. What actually decides it is minimum order, cash-out time, and how expensive a mistake is to fix.

Updated September 21, 2026·4 min read

Founders settle this question by default — someone recommends a supplier, and the country comes along with them. It is worth making as a decision, because for a first run the deciding factor is almost never the unit price, and the country changes three things that matter more: the minimum you can order, how long your cash is out, and what happens when something is wrong.

The comparison that actually matters

ChinaUnited StatesTaiwanMexico
Unit costLowestHighestModerateLow to moderate
Typical minimumHighModerateModerateModerate
Deposit to warehouse10–20 weeks4–8 weeks8–14 weeks4–8 weeks
Cost of a mistakeHigh — a reprint is a new shipmentLowHighModerate
Component choiceWidest by farNarrowerStrong in specific nichesNarrower
Ease of visitingHardEasyHardEasy from North America
Ranges for a small consumer-goods run, not a rule. Your category will shift them.

The number that decides it: cash-out time

A China run at $1.10 a unit and a US run at $1.85 a unit look like an obvious choice until you account for when the money leaves. The overseas order takes a deposit of 30% to 50% before production, the balance before shipping, then five to eight weeks at sea, then customs. Your cash is committed for three to five months before a single unit can be sold.

For a first-time founder funding a batch personally, that is frequently the binding constraint, not the price. A 68% higher unit cost that turns over twice in the time the cheaper option turns over once is not more expensive in any sense you care about.

Cost of a mistake

This is the column founders discover rather than plan for. First batches have errors: an ingredient in the wrong order on the label, a fill weight a little light, a cap that scuffs in transit, a printed colour that is not the colour you approved. Domestically, most of those are a week and a courier. From overseas, a reprint is a new production slot and a new shipment, and a fix that would have cost $400 costs $4,000 and eight weeks.

Which is an argument for making the first run close to home even at a worse price, and moving production once the specification has stopped changing. The specification stops changing later than anyone expects.

Where each genuinely wins

Split the run, not the relationship

The most common good answer is not one country. It is packaging from where packaging is good and filling close to where you sell — bottles from China, formula and filling in the United States. You take on one extra logistics leg and you get the component range of one market with the iteration speed of the other.

That arrangement has a name and a shape: it is co-packing, and it is also a way under a minimum.

Whatever you choose, price it landed

A cross-border comparison is meaningless at the quote line. Freight, duty, brokerage and the domestic leg have to be in the number before the two options can be set beside each other, and the gap between quoted and landed is routinely 40% or more on an overseas run — how to get to a landed number.

Tell Batchkind where you want to make it and it will only show you suppliers in that region — with the page that says where they are.

Start finding your maker

Thanks. One email when the next guide is up.

That did not look like an email address. Try again.

Hear when the next guide is up

One short email when a guide or free tool is published. Nothing else, and one click to stop.